Step 1
|
Step 2
|
|
 |
|
Make sure that you use a qualified and experienced
contractor for the installation.
|
Preparing for anchoring with steel tubing
|
Step 3
|
Step 4
|
 |
 |
|
Prefab cement anchoring blocks are placed on
top of steel tubing.
|
Back fill around shelter making sure to use top
soil on the last 4" to 6".
|
Step 5
|
Step 6
|
 |
 |
|
Make sure that all water drains away from door
opening.
|
Final landscaping can be done after soil has
settled. You may choose to sod with grass or use pine bark with
shrubs for decoration. Your "THE REFUGE" is now ready
for use.
|